The City of Moose Jaw’s Water Main Replacement Program continues in three locations. The recent heavy rain fall has impacted the construction schedule slightly, though the city is working hard to complete the work.

On Athabasca St. W. between 9th Ave-10th, all pipe replacement is complete. Paving on the 900 block has been delayed due to the rainfall, and the completion date is July 23rd weather permitting.

Edmonton St NW from 10th to 11th, the water main pipe is installed but there is a high volume of residential service connections to complete. Connections are estimated to be complete by July 25th, weather permitting.

Current photo of 10th Ave Edmonton.

First Ave NE from Saskatchewan St to Caribou St, crews are on the first stage of replacing water main from Saskatchewan St. to Hall St. When finished, work will continue down to Caribou St.

Other locations selected for completion during the 2019 construction season are as follows:

Third Ave NE from Athabasca St. NE to Hochelaga St E
Main St. N from Hochelaga St. NE to Athabasca St NE
Athabasca St. NE from Main St. N to First Ave NE
Fairford St. NE from Fifth Ave NE to Sixth Ave NE
Stadacona St. NW from 12th Ave NW to 11th Ave NW

All drivers are asked to obey posted detours and signage, and to exercise caution in all work zones.